This project is part of a 4-turbine wind farm.
This project is in line with the “Projet de Territoire Wallonie picarde 2025”, one of the objectives of which
is to make Picardy Wallonia a region of environmental excellence.
It is in line with current Walloon regional policy, which aims to stimulate
wind power developments along motorway infrastructures and in areas of economic activity.
In all, the wind farm is expected to generate around
26,000 MWh annually, equivalent to the consumption of around 12,000 households.