Website Preloader

Connecting the future with wind farm electrification

25 Sep 23Environment, Industrial electricity (HV-MV-LV)

This project is part of a 4-turbine wind farm.
This project is in line with the “Projet de Territoire Wallonie picarde 2025”, one of the objectives of which
is to make Picardy Wallonia a region of environmental excellence.
It is in line with current Walloon regional policy, which aims to stimulate
wind power developments along motorway infrastructures and in areas of economic activity.


In all, the wind farm is expected to generate around
26,000 MWh annually, equivalent to the consumption of around 12,000 households.

Technord news

More articles to discover.

Syscade: feedback on an automation / process control project

The Syscade project, which recently won the jury and public awards at the Wap'Innov competition, involves developing a mobile laboratory for inspecting and characterizing nuclear waste. Background to the Syscade project For many years, a great deal of radioactive...

Adaptation of a petrochemical production unit

Find out how our teams worked with a world leader in the energy sector. Customer challenge A global player in the energy sector, our customer wanted to transform an existing petrochemical production unit in order to produce a different raw material locally.Its...

Renewable energies: wind and solar power generation

The growing presence of renewable energies in the energy mix is a major environmental challenge. Our employees in the Medium Voltage department (industrial electricity) work to make wind and solar power available to a wide range of facilities. Find out more about our...

Low-voltage project for Technord’s Industrial Electricity department

Find out how our industrial electrical experts helped install a new low-voltage mixer feeder. Customer challenge Following the success of its products, one of our customers, a major player in the industrial bakery sector, was faced with an urgent need to increase its...

Innovative solutions for decarbonization

In a world where the fight against climate change has become a priority, the decarbonization of industrial activities is essential. As a leader in industrial engineering, Technord offers innovative solutions to help its customers reduce their carbon footprint. Here's...

Optimizing the high-voltage network

For a customer in the pharmaceutical sector, our teams integrated renewable energy production into a new head cab. Customer challenge The initial request was to carry out pre-studies and draw up specifications for redesigning the site's high-voltage network, in...

Boiler House: excellence in electrical management and integrated safety

We regularly carry out projects at the Belgian production sites of a global pharmaceutical company in the healthcare sector. Read about the work of our Low Voltage department teams as they commissioned a new boiler house. Customer challenge Our team in the Low Voltage...

At Technord, unity is strength

The complementary nature of our product lines is our strength as an industrial integrator. We often work with our customers on different projects, where the collaboration of our teams brings significant added value to the success of the project. These...

Pairi Daiza adapts to new energy challenges

Pairi Daiza, the superb animal park in Picardy Wallonia, voted best zoo in Europe, has entrusted Technord with the adaptation of its Medium Voltage power supplies. Customer challenge The existing 5MVA connection was insufficient for the development of the park and the...

Expertise in high-voltage connections 150kV/6.6kV

Mission description Studies, design and detailed drawings for all high, medium and low-voltage electrical installations Supply, manufacture and delivery of the various components On-site assembly Commissioning Assistance with project follow-up and plant...