Find out how our teams worked with a world leader in the energy sector.

Customer challenge

A global player in the energy sector, our customer wanted to transform an existing petrochemical production unit in order to produce a different raw material locally.
Its objective was to specialize in the production of high value-added materials while controlling environmental aspects.

Technord’s solution

Technord’s teams carried out the detailed study of the electrical power and control systems:

  • Cable cross-section calculation
  • Package power supply
  • Pathway sizing
  • Lighting and sockets
  • Electrical tracing power supply
  • Electrical drawings

The electrical part of the project also included the study of the earthing system, on-site works, bringing the existing installation up to standard, coordination with the contractors of the other lots, trials, tests and commissioning of the installation, as well as control by the approved body and the AS-Built file.

Our teams also took charge of detailed instrumentation studies:

  • Loop design
  • Dimensioning paths and new junction boxes
  • Creation of a PROFINET network for the complete unit
  • PROFIBUS network modification
  • Valve air supply
  • Modification of existing PLC cabinet wiring
  • Equipotential bonding network

The instrumentation part of the project also included coordination with the contractors of the other lots, on-site services (installation and connection of instruments, modification of instrumentation cabinet wiring, installation of cable trays, air supply to valves, etc.), inspection by the approved body, testing and commissioning of the installation and the As Built file.

This project was carried out in close collaboration with our partner-supplier Ysebaert, specialized in the supply of equipment for ATEX environments (environments where the risk of explosion is high due to the presence of flammable materials).

A few figures on the project

  • 1455 hours of study
  • 12,500 hours of on-site services
  • 10-month project

Customer gain

This successful revamping limited the dismantling of components and the production of significant amounts of waste. Numerous instruments were recovered.
This transformation also enabled the local production of raw materials without the need for road or river transport, the use of local labor and a reduction in CO2 emissions.
Our team therefore contributed to the improvement of the industrial process while helping to respect the environment.

Technord news

More articles to discover.

Syscade: feedback on an automation / process control project

The Syscade project, which recently won the jury and public awards at the Wap'Innov competition, involves developing a mobile laboratory for inspecting and characterizing nuclear waste. Background to the Syscade project For many years, a great deal of radioactive...

Renewable energies: wind and solar power generation

The growing presence of renewable energies in the energy mix is a major environmental challenge. Our employees in the Medium Voltage department (industrial electricity) work to make wind and solar power available to a wide range of facilities. Find out more about our...

Low-voltage project for Technord’s Industrial Electricity department

Find out how our industrial electrical experts helped install a new low-voltage mixer feeder. Customer challenge Following the success of its products, one of our customers, a major player in the industrial bakery sector, was faced with an urgent need to increase its...

Innovative solutions for decarbonization

In a world where the fight against climate change has become a priority, the decarbonization of industrial activities is essential. As a leader in industrial engineering, Technord offers innovative solutions to help its customers reduce their carbon footprint. Here's...

Connecting the future with wind farm electrification

This project is part of a 4-turbine wind farm.This project is in line with the "Projet de Territoire Wallonie picarde 2025", one of the objectives of whichis to make Picardy Wallonia a region of environmental excellence.It is in line with current Walloon regional...

Optimizing the high-voltage network

For a customer in the pharmaceutical sector, our teams integrated renewable energy production into a new head cab. Customer challenge The initial request was to carry out pre-studies and draw up specifications for redesigning the site's high-voltage network, in...

Boiler House: excellence in electrical management and integrated safety

We regularly carry out projects at the Belgian production sites of a global pharmaceutical company in the healthcare sector. Read about the work of our Low Voltage department teams as they commissioned a new boiler house. Customer challenge Our team in the Low Voltage...

At Technord, unity is strength

The complementary nature of our product lines is our strength as an industrial integrator. We often work with our customers on different projects, where the collaboration of our teams brings significant added value to the success of the project. These...

Pairi Daiza adapts to new energy challenges

Pairi Daiza, the superb animal park in Picardy Wallonia, voted best zoo in Europe, has entrusted Technord with the adaptation of its Medium Voltage power supplies. Customer challenge The existing 5MVA connection was insufficient for the development of the park and the...

Expertise in high-voltage connections 150kV/6.6kV

Mission description Studies, design and detailed drawings for all high, medium and low-voltage electrical installations Supply, manufacture and delivery of the various components On-site assembly Commissioning Assistance with project follow-up and plant...